More in this section

  • New priority projects in Western Visayas

    New priority projects in Western Visayas

    2–3 minutes

    Of the 194 priority projects in the country, there are 10 projects located in Western Visayas. These include five continuing projects which are ongoing with the construction phase, detailed engineering design, and project preparation.

  • Anti-Lock Braking System: Should it be required?

    Anti-Lock Braking System: Should it be required?

    3–5 minutes

    The anti-lock braking system was among the many important safety accessories for powered two-wheelers (especially motorcycles) that became a major discussion in the recently concluded Dialogue on Powered Two-Wheeler (PTW) Safety conducted by the Global Regional Road Safety Observatories as a pre-meeting event of the Asia-Pacific Road Safety Observatory Annual Meeting held at the Asian…

  • How to outsmart the fuel price hike

    How to outsmart the fuel price hike

    3–5 minutes

    While the government employed several measures to mitigate the rise in oil prices, it is still expected that such fuel price hikes would have general effects on the entirety of the Philippine economy, especially in food production, logistics and transportation.

  • Infrastructure is the key: Lessons from Iloilo City’s Bike Lanes

    Infrastructure is the key: Lessons from Iloilo City’s Bike Lanes

    4–5 minutes

    I found that there is a direct link on how infrastructure for cycling has influenced the increase of cyclists in Iloilo City. Through historical data review and stakeholder surveys, I structured how the cycling culture developed in Iloilo City.